Block MeterThis control element shows a meter: the consumption from today up to the year with a comparison to the previous period, the costs and the history as bars. For water it also shows the water protection with valve, leak sensors and the current draw-off. It belongs to the function block Block Meter and is only available in the new block design.
Tapping the bars opens the history directly, tapping the rest of the tile opens the overview. If -.-- is shown instead of a number, no data is available yet.
On a low, wide tile (less than 180 pixels high) yesterday, month and costs are on the right and the bars in the footer. For water with water protection the footer there shows the valve, the leak sensors and the current draw-off instead of the bars – red or coloured when active.
Symbol: in the Studio a different symbol for the tile and the dialogs can be chosen under Icon. Only the symbols of the program are offered, so that they adapt to the style; if left empty, the symbol of the medium is used.
The share symbol in the title bar passes the chart on as an image. Behind the gear are the export as a CSV file and Delete data (after a confirmation).
Aligns the meter reading with the register of the meter. If Meter was replaced is switched on, the next value of the new meter becomes the base. Daily, monthly and yearly values remain in both cases, the action is written to the log.
The last 32 events with time: which rule triggered, with value and limit, plus valve, acknowledge, meter replacement, overflow, discarded values, large draw-off and learning phase.
Triggers an alarm for the set duration and, for water, closes the valve. Afterwards it opens again by itself.
| Costs | Prices from the project (default): tariff, current price and base fee come from the tariffs of the project and are only shown; for water the waste water tariff can be added. Without a matching tariff or for an exchange-based tariff the own prices apply. Own prices: energy price, single tariff or peak/off-peak by time or via input HT, base fee per month and the feed-in tariff. For gas the price is per kWh. The currency comes from the project. |
| Conversion to kWh | Gas: calorific value and correction factor from the gas bill. Oil and pellets: heating value. |
| Monitoring | Daily limit; deviation from the mean of the last 14 days with factor and minimum amount (at the earliest after one week); continuous consumption or base load at night: within the night window the set quiet time must occur once, otherwise it is reported; meter not sending (requires a meter that sends regularly); repeat alarm. |
| Water protection | For each rule off, report or shut off: volume per draw-off (default present 300 l, absent 50 l), duration per draw-off (60 or 10 minutes), flow too high (3000 l/h for longer than 60 s), leak sensor. In addition the idle time after which a draw-off ends – choose it longer than the sending interval of the meter –, automatically absent without draw-off, the duration of the large draw-off, the waiting time for the valve feedback and the duration of the test mode. |
A right-click on the control element in the Studio selects the block.